Scope of Work
ҹɫÊÓƵ provided trained personnel to operate the Hanover Street and Pennington Avenue drawbridge. Each bridge operator was familiar with the bridge layout and trained in the operation and maintenance of the bridge, including all emergency power and manual back-up systems.
Project Details
- Provided maintenance personnel to maintain the mechanical and electrical equipment and systems in accordance to the operation and maintenance manuals
- Provided septic pump-out service below the drawbridge
- Greased open gears frequently per lubrication schedule
- Replaced light bulbs as necessary, including channel lights
- Ensured the electrical rooms are kept clean and adhering to a monthly cleaning schedule of the cabinets
- Ensured the electrical and mechanical operating centers of the bridge are kept clean from any bird droppings or debris
Lean, Innovative and Unique Project Solutions
Unexpected repairs and troubleshooting bridge operation failures were a challenge in maintaining full operation of the bridge without traffic delays or lane closures.