Location:
Baltimore, MD
Completed:
2016

Dundalk Marine Terminal Berths 1-2 Cutoff Wall

Scope of Work
ҹɫÊÓƵ installed a sheet pile cutoff wall in Berths 1 and 2 and performed miscellaneous water main repairs along the berth.
Project Details
  • Placed 720 linear feet of AZ 14 x 770 steel sheet pile
  • Removed and replaced 18 inch GAB and HMA
  • Removed 608 linear feet of 4-inch & 10-inch paint striping and thermos-plastic pavement markings
  • Test pit utilities, tie-rods, and sheeting
  • Performed an underwater preconstruction timber pile survey
  • Timber pile/cap connection repairs
Lean, Innovative and Unique Project Solutions
The project took place while regular activity continued at the ship berth. There was continuous ship traffic offloading and loading. This created hazardous traffic conditions in and around the work site. 
No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.