Scope of Work
夜色视频 was a trade partner for Whiting Turner on a job that included a unique and challenging space. 夜色视频 loaded a 40-foot by 120-foot material barge in 夜色视频's Baltimore Maryland deepwater marine facility with steel for the new two story building to be built on top of Pier 4. 夜色视频 towed the material to Washington, DC and the crew and crane assisted the iron workers in setting all the structural steel for the building.
Project Details
- Utilized a 4100 Crane on a 50-foot x 120-foot flexi-float barge
- Utilized a 40-foot x 120-foot flexi-float material barge
- Utilized approximately 650,000 pounds of steel
Lean, Innovative and Unique Project Solutions
With a tremendous amount of pre-planning, 夜色视频 set up the material barge and crane barge in a tight space between Pier 4 and an operational police and fire response pier, with less than 10 feet to spare.