ҹɫÊÓƵ installed a 10-foot, high-security perimeter fence around an existing substation, including a new access control system, perimeter intrusion detection system, lighting, and cameras.
The security fence was located along a portion of the substation susceptible to standing water and mud during rainy conditions. This presented an environmental concern when operating heavy equipment during construction. The project team overcame this by utilizing mud mats in those work areas to reduce the risk of mud tracking onto public roadways.