The West Wall Santee Basin Bulkhead Repair Project included the complete rehabilitation of a 410 linear feet bulkhead. The existing bulkhead was built shortly after World War II and became structurally deficient over time, which allowed sediment to pass into the basin, creating multiple sinkholes along the bulkhead. Due to the complexity of the project, as well as the design-build delivery method, ҹɫÊÓƵ had a close working relationship with both the prime contractor and designer which led to a project completed on schedule and under budget.